| Started or completed pipeline project |
Annabel field to Audrey A platform |
18 km / 11 miles |
1 000 mt |
| Started or completed pipeline project |
Arzew, Bejaia, Skikda loading buoys |
45 km / 28 miles |
26 000 mt |
| Started or completed pipeline project |
Asgard Q Satellite Development |
27 km / 17 miles |
1 400 mt |
| Started or completed pipeline project |
Auntie Julie platform to Funiwa platform |
21 km / 13 miles |
2 000 mt |
| Started or completed pipeline project |
Bayu-Undan to Darwin Gas line |
675 km / 420 miles |
153 000 mt |
| Started or completed pipeline project |
Benguela and Belize compliant tower to the Kuito FPSO |
100 km / 62 miles |
21 000 mt |
| Started or completed pipeline project |
Block 9 Pipeline |
169 km / 105 miles |
11 500 mt |
| Started or completed pipeline project |
Bremen to Knoxville |
306 km / 190 miles |
45 000 mt |
| Started or completed pipeline project |
Britpipe (Ormen Lange to Nyhamma) |
306 km / 190 miles |
90 000 mt |
| Started or completed pipeline project |
BTC Pipeline |
1730 km / 1075 miles |
1 060 000 mt |
| Started or completed pipeline project |
Bukha Field to Sohar gas pipeline |
350 km / 218 miles |
73 000 mt |
| Started or completed pipeline project |
Caesar |
193 km / 120 miles |
53 000 mt |
| Started or completed pipeline project |
Calder Platform to Barrow |
45 km / 28 miles |
10 500 mt |
| Started or completed pipeline project |
Cameron Highway Oil Pipeline System |
628 km / 390 miles |
158 000 mt |
| Started or completed pipeline project |
Camisea Condensate Pipeline |
539 km / 335 miles |
26 000 mt |
| Started or completed pipeline project |
Camisea fields to Lima city gate gas pipeline |
714 km / 444 miles |
155 000 mt |
| Started or completed pipeline project |
Cassia B platform to Rushville gas pipeline |
63 km / 39 miles |
26 500 mt |
| Started or completed pipeline project |
Changqing to Hohhot |
497 km / 309 miles |
33 000 mt |
| Started or completed pipeline project |
Chen Tou Jiao to Lamma Island pipeline |
92 km / 57 miles |
19 300 mt |
| Started or completed pipeline project |
Chester and New Castle expansion |
10 km / 6 miles |
1 000 mt |
| Started or completed pipeline project |
Cheyenne Plains natural Gas Pipeline |
611 km / 380 miles |
260 000 mt |
| Started or completed pipeline project |
China to South Korea Gas Pipeline |
1200 km / 746 miles |
350 000 mt |
| Started or completed pipeline project |
Clayton to Monroe Pipeline |
129 km / 80 miles |
27 000 mt |
| Started or completed pipeline project |
Cleopatra |
193 km / 120 miles |
28 000 mt |
| Started or completed pipeline project |
Concord to Sacramento pipeline |
113 km / 70 miles |
16 500 mt |
| Started or completed pipeline project |
D 12-A Platform to D 15-FA-1 Platform |
5 km / 3 miles |
255 mt |
| Started or completed pipeline project |
Denmark to England Pipeline |
550 km / 342 miles |
80 000 mt |
| Started or completed pipeline project |
DFW Project - Dallas Forth Worth pipeline |
257 km / 160 miles |
75 000 mt |
| Started or completed pipeline project |
Doba (Chad) to Kribi (Cameroon) Pipeline |
1078 km / 670 miles |
226 000 mt |
| Started or completed pipeline project |
Dolphin Gas Project pipeline |
572 km / 356 miles |
360 000 mt |
| Started or completed pipeline project |
Dominion Expansion Project |
56 km / 35 miles |
24 000 mt |
| Started or completed pipeline project |
Donna Line to Matamoros |
67 km / 42 miles |
20 000 mt |
| Started or completed pipeline project |
Donna line to Tamaulipas pipeline |
15 km / 9 miles |
4 400 mt |
| Started or completed pipeline project |
East Tennessee Natural Gas (ETNG) |
280 km / 174 miles |
50 000 mt |
| Started or completed pipeline project |
Egypt to Cyprus Gas Line Phase 1 - Taba to Aqaba |
48 km / 30 miles |
14 000 mt |
| Started or completed pipeline project |
Elephant Field to Hamada Field |
73 km / 45 miles |
15 300 mt |
| Started or completed pipeline project |
EnCana Ekwan Pipeline |
82 km / 51 miles |
17 200 mt |
| Started or completed pipeline project |
Enrico Mattei Transmed |
301 km / 187 miles |
211 000 mt |
| Started or completed pipeline project |
Eugene Island |
7 km / 4 miles |
100 mt |
| Started or completed pipeline project |
Everett Delta Lateral |
14 km / 9 miles |
1 400 mt |
| Started or completed pipeline project |
Falcon Field discovery |
32 km / 20 miles |
3 900 mt |
| Started or completed pipeline project |
First phase of the Shuweihat IWPP |
120 km / 75 miles |
14 600 mt |
| Started or completed pipeline project |
Fort Nelson Mailine Extension |
4 km / 2 miles |
1 600 mt |
| Started or completed pipeline project |
Fort Nelson to Rainbow Lake gas Pipeline |
82 km / 51 miles |
17 000 mt |
| Started or completed pipeline project |
Front Runner Pipeline |
58 km / 36 miles |
4 000 mt |
| Started or completed pipeline project |
Garden Banks Block 783 to Block 128 - Gas line |
88 km / 55 miles |
8 900 mt |
| Started or completed pipeline project |
Garden Banks Block 783 to Block 128 - Oil line |
88 km / 55 miles |
7 100 mt |
| Started or completed pipeline project |
Gasoducto del Pacífico |
418 km / 260 miles |
122 000 mt |
| Started or completed pipeline project |
Gasoducto Norte pipeline |
234 km / 145 miles |
12 000 mt |
| Started or completed pipeline project |
Goldeneye Field to St Fergus |
105 km / 65 miles |
7 000 mt |
| Started or completed pipeline project |
Gormanstown to Scottish Pipeline 2nd phase |
150 km / 93 miles |
18 000 mt |
| Started or completed pipeline project |
Grassland Pipeline |
407 km / 253 miles |
41 000 mt |
| Started or completed pipeline project |
Grays Harbor lateral |
79 km / 49 miles |
11 500 mt |
| Started or completed pipeline project |
Grimes County to East Texas central |
113 km / 70 miles |
48 000 mt |
| Started or completed pipeline project |
Grizzly Pipeline |
108 km / 67 miles |
10 900 mt |
| Started or completed pipeline project |
Gulfstream natural gas system |
286 km / 178 miles |
80 000 mt |
| Started or completed pipeline project |
Gulfstream’s Phase II pipeline (Polk County to Martin) |
177 km / 110 miles |
52 000 mt |
| Started or completed pipeline project |
Gurguri to Kohat pipeline |
77 km / 48 miles |
4 000 mt |
| Started or completed pipeline project |
Hangzhou to Shanghai and Nanjing Oil Pipeline |
160 km / 99 miles |
23 000 mt |
| Started or completed pipeline project |
Haoud El Hamra to Laghouat oil pipeline |
418 km / 260 miles |
152 000 mt |
| Started or completed pipeline project |
Hassi Berkine to Haoudh El Hamra oil pipeline |
290 km / 180 miles |
20 000 mt |
| Started or completed pipeline project |
High Desert Lateral |
52 km / 32 miles |
11 000 mt |
| Started or completed pipeline project |
In Salah Pipeline |
600 km / 373 miles |
420 000 mt |
| Started or completed pipeline project |
Iroquois Gas' Eastchester expansion project |
51 km / 32 miles |
10 700 mt |
| Started or completed pipeline project |
Islander East |
80 km / 50 miles |
16 800 mt |
| Started or completed pipeline project |
Ivana, Ika, Ida, Annamaria and Marica fields to Pula |
119 km / 74 miles |
17 000 mt |
| Started or completed pipeline project |
Ixonia to Germantown and Brookfield pipeline |
56 km / 35 miles |
16 300 mt |
| Started or completed pipeline project |
Jackson to Port Washington pipeline |
26 km / 16 miles |
5 500 mt |
| Started or completed pipeline project |
Jingzhou to Xiangfan |
209 km / 130 miles |
61 000 mt |
| Started or completed pipeline project |
Joffre to Fort Saskatchewan |
180 km / 112 miles |
9 100 mt |
| Started or completed pipeline project |
Joliet to McHenry County pipeline |
43 km / 27 miles |
18 000 mt |
| Started or completed pipeline project |
Kambalda to Esperance Pipeline |
349 km / 217 miles |
9 000 mt |
| Started or completed pipeline project |
Kazakhstan China Line - Section 2 - Atasu to Alashankou |
988 km / 614 miles |
339 000 mt |
| Started or completed pipeline project |
Kenai to Anchor Point |
13 km / 8 miles |
700 mt |
| Started or completed pipeline project |
Kenkiyak to Atyrau oil pipeline |
449 km / 279 miles |
131 300 mt |
| Started or completed pipeline project |
Kermit to Hueco gas pipeline |
290 km / 180 miles |
61 000 mt |
| Started or completed pipeline project |
Kern River Gas Transmission 2003 expansion Project |
1152 km / 716 miles |
552 000 mt |
| Started or completed pipeline project |
Kern River Gas Transmission to southern main line of the El Paso Natural Gas |
483 km / 300 miles |
140 000 mt |
| Started or completed pipeline project |
Knoxville Tennessee Expansion |
69 km / 43 miles |
7 000 mt |
| Started or completed pipeline project |
Komsomolsk-Khabarovsk |
502 km / 312 miles |
105 000 mt |
| Started or completed pipeline project |
Korpeje-Balkanabad crude Oil Pipeline |
172 km / 107 miles |
11 600 mt |
| Started or completed pipeline project |
Krechba to Hassi R'Mel gas pipeline |
500 km / 311 miles |
350 000 mt |
| Started or completed pipeline project |
Kristen Field Gas Lines |
31 km / 19 miles |
15 000 mt |
| Started or completed pipeline project |
Kristen Field Oil Line |
23 km / 14 miles |
2 300 mt |
| Started or completed pipeline project |
Kumagaya-Sano line |
42 km / 26 miles |
4 200 mt |
| Started or completed pipeline project |
Laghouat to Arzew oil pipeline |
402 km / 250 miles |
147 000 mt |
| Started or completed pipeline project |
Lanzhou to Chongqing product Pipeline |
1247 km / 775 miles |
125 500 mt |
| Started or completed pipeline project |
Laredo and Corpus Christi gas line |
101 km / 63 miles |
4 900 mt |
| Started or completed pipeline project |
Leidy Pipeline to Central New Jersey |
50 km / 31 miles |
29 000 mt |
| Started or completed pipeline project |
Lekhwair Field |
88 km / 55 miles |
9 000 mt |
| Started or completed pipeline project |
Loma La Lata - Buenos Aires |
965 km / 600 miles |
280 000 mt |
| Started or completed pipeline project |
Louisiana unloading buoy to existing subsea pipelines |
13 km / 8 miles |
1 900 mt |
| Started or completed pipeline project |
Madison lateral |
53 km / 33 miles |
7 700 mt |
| Started or completed pipeline project |
Manmad to Indore Pipeline |
380 km / 236 miles |
46 400 mt |
| Started or completed pipeline project |
Mariquita Cali |
780 km / 485 miles |
113 000 mt |
| Started or completed pipeline project |
Megri-Agarak to Kadzharan gas pipeline |
42 km / 26 miles |
11 500 mt |
| Started or completed pipeline project |
Methuen to Beverly pipeline |
39 km / 24 miles |
7 300 mt |
| Started or completed pipeline project |
Mexico / Costa Rica Phase 1 |
558 km / 347 miles |
163 000 mt |
| Started or completed pipeline project |
Mid-Atlantic expansion project |
56 km / 35 miles |
7 000 mt |
| Started or completed pipeline project |
Milford - New Jersey - Pennsylvania Pipeline |
64 km / 40 miles |
9 300 mt |
| Started or completed pipeline project |
Millenium pipeline project. |
670 km / 416 miles |
192 000 mt |
| Started or completed pipeline project |
Mina al Fahal Facility to the new Sohar Refinery |
259 km / 161 miles |
54 400 mt |
| Started or completed pipeline project |
Moab to Nephi pipeline |
418 km / 260 miles |
28 300 mt |
| Started or completed pipeline project |
Moaming to Changpo Southwest Product Pipeline |
1691 km / 1051 miles |
225 000 mt |
| Started or completed pipeline project |
Montainer Shallow Water |
79 km / 49 miles |
11 500 mt |
| Started or completed pipeline project |
Montreal to Farran's Point product Pipeline |
72 km / 45 miles |
4 000 mt |
| Started or completed pipeline project |
Montrose platform to Arbroath platform water injection line |
8 km / 5 miles |
400 mt |
| Started or completed pipeline project |
Mumbai to Uran gas line |
203 km / 126 miles |
55 000 mt |
| Started or completed pipeline project |
Mumbai to Uran oil line |
203 km / 126 miles |
60 000 mt |
| Started or completed pipeline project |
Na Kika Field to the Destin pipeline |
119 km / 74 miles |
25 000 mt |
| Started or completed pipeline project |
New Mexico Products Pipeline |
151 km / 94 miles |
15 200 mt |
| Started or completed pipeline project |
Nini and Cecilie Oil Fields |
33 km / 21 miles |
2 700 mt |
| Started or completed pipeline project |
North Baja pipeline |
346 km / 215 miles |
126 000 mt |
| Started or completed pipeline project |
North West Shelf Venture field to Burrup Peninsula |
130 km / 81 miles |
74 000 mt |
| Started or completed pipeline project |
Northwinds Pipeline |
346 km / 215 miles |
101 000 mt |
| Started or completed pipeline project |
Onslow to Geraldton Gas Pipeline |
800 km / 497 miles |
234 000 mt |
| Started or completed pipeline project |
Oseberg South |
7 km / 4 miles |
250 mt |
| Started or completed pipeline project |
Patriot Expansion Project |
151 km / 94 miles |
32 000 mt |
| Started or completed pipeline project |
Phase III of Terrace expansion project |
193 km / 120 miles |
81 000 mt |
| Started or completed pipeline project |
PM3 CAA to the Resak Platform |
170 km / 106 miles |
35 700 mt |
| Started or completed pipeline project |
Polpipe |
230 km / 143 miles |
67 000 mt |
| Started or completed pipeline project |
Port Campbell to Adelaide |
680 km / 423 miles |
55 000 mt |
| Started or completed pipeline project |
Projeto Malhas Sudeste |
448 km / 278 miles |
106 000 mt |
| Started or completed pipeline project |
Pryor to Watts pipeline |
47 km / 29 miles |
1 200 mt |
| Started or completed pipeline project |
Q5-A to Q8-B platforms |
13 km / 8 miles |
500 mt |
| Started or completed pipeline project |
Qianjiang to Xiangtan Extension |
340 km / 211 miles |
93 000 mt |
| Started or completed pipeline project |
Quadrant Development Pipeline |
27 km / 17 miles |
1 000 mt |
| Started or completed pipeline project |
Rancho Pipeline Conversion Project |
209 km / 130 miles |
44 000 mt |
| Started or completed pipeline project |
Red Hawk Field to Vermillon Pipeline |
138 km / 86 miles |
14 000 mt |
| Started or completed pipeline project |
Ringhorne Platform Gas Line |
24 km / 15 miles |
900 mt |
| Started or completed pipeline project |
Ringhorne Platform oil offshore line |
24 km / 15 miles |
1 600 mt |
| Started or completed pipeline project |
Ringhorne Platform oil onshore line |
56 km / 35 miles |
2 800 mt |
| Started or completed pipeline project |
Rio Grande (Bolivia) to Guararema and Porto Alegre |
2593 km / 1612 miles |
712 000 mt |
| Started or completed pipeline project |
Rockies Expansion Project |
146 km / 91 miles |
43 000 mt |
| Started or completed pipeline project |
Sabratha offshore platform to Mellitah pipeline |
194 km / 121 miles |
40 000 mt |
| Started or completed pipeline project |
Scarab Saffron gas field pipeline |
180 km / 112 miles |
45 200 mt |
| Started or completed pipeline project |
SCP Pipeline (South Caucasus Gas Pipeline) |
690 km / 429 miles |
642 000 mt |
| Started or completed pipeline project |
Second Joso Line |
20 km / 12 miles |
2 000 mt |
| Started or completed pipeline project |
Second Shaanxi-Beijing Gas Pipeline |
861 km / 535 miles |
87 000 mt |
| Started or completed pipeline project |
Sever Project |
1309 km / 814 miles |
275 000 mt |
| Started or completed pipeline project |
Seville to Cordoba Gas Pipeline |
156 km / 97 miles |
45 600 mt |
| Started or completed pipeline project |
Snohvit infield flowlines |
310 km / 193 miles |
8 900 mt |
| Started or completed pipeline project |
Songo Songo Island to Dar-es-Salaam |
225 km / 140 miles |
11 400 mt |
| Started or completed pipeline project |
South Caucasus Pipeline / BTE (Baku-Tbilisi-Erzurum) Pipeline |
885 km / 550 miles |
506 mt |
| Started or completed pipeline project |
South Mist Pipeline Extension |
79 km / 49 miles |
20 000 mt |
| Started or completed pipeline project |
South System Expansion project phase 3 |
56 km / 35 miles |
20 000 mt |
| Started or completed pipeline project |
South Texas Expansion |
26 km / 16 miles |
4 400 mt |
| Started or completed pipeline project |
Southern sector pipeline |
38 km / 24 miles |
2 000 mt |
| Started or completed pipeline project |
Southwest Missouri Expansion Project |
26 km / 16 miles |
3 800 mt |
| Started or completed pipeline project |
Sudal Pipeline |
470 km / 292 miles |
160 000 mt |
| Started or completed pipeline project |
Sun Devil Pipeline Expansion Project |
644 km / 400 miles |
272 000 mt |
| Started or completed pipeline project |
Temane and Pande to Secunda |
890 km / 538 miles |
197 000 mt |
| Started or completed pipeline project |
Terrace Phase III Expansion |
177 km / 110 miles |
74 600 mt |
| Started or completed pipeline project |
Texas Eastern M1 Expansion, Phase 1, 2 and 3 |
51 km / 32 miles |
21 000 mt |
| Started or completed pipeline project |
Texas Eastern transmission - M1 expansion |
51 km / 32 miles |
13 608 mt |
| Started or completed pipeline project |
The Canyon Express Pipeline |
367 km / 228 miles |
50 000 mt |
| Started or completed pipeline project |
Third independent water and power project (IWPP) |
20 km / 12 miles |
11 400 mt |
| Started or completed pipeline project |
Tiguentourine to Ohanet Condensate Pipeline |
111 km / 69 miles |
5 700 mt |
| Started or completed pipeline project |
Tiguentourine to Ohanet Gas Pipeline |
111 km / 69 miles |
47 000 mt |
| Started or completed pipeline project |
Tochigi pipeline |
70 km / 44 miles |
7 000 mt |
| Started or completed pipeline project |
Trans Europa NaturGas Pipeline (TENP) |
500 km / 311 miles |
146 000 mt |
| Started or completed pipeline project |
Trans Thailand Pipeline |
346 km / 215 miles |
243 000 mt |
| Started or completed pipeline project |
Trans-Balkan Pipeline Expansion (Gas transit Phase 2) |
70 km / 44 miles |
20 000 mt |
| Started or completed pipeline project |
Transco National Transmission & Trading |
43 km / 27 miles |
30 000 mt |
| Started or completed pipeline project |
Tri-Community Natural Gas Project |
47 km / 29 miles |
1 200 mt |
| Started or completed pipeline project |
Tuscarora Pipeline Expansion |
23 km / 14 miles |
1 200 mt |
| Started or completed pipeline project |
Tyra - Nogat pipeline |
100 km / 62 miles |
23 000 mt |
| Started or completed pipeline project |
Visund Field Pipeline |
38 km / 24 miles |
5 500 mt |
| Started or completed pipeline project |
Wadsworth lateral |
23 km / 14 miles |
3 300 mt |
| Started or completed pipeline project |
Wafa to Mellitah Gas Line |
520 km / 323 miles |
179 000 mt |
| Started or completed pipeline project |
Wafa to Mellitah Oil Line |
520 km / 323 miles |
52 300 mt |
| Started or completed pipeline project |
West Leg Pipeline Project |
52 km / 32 miles |
13 800 mt |
| Started or completed pipeline project |
West-East Pipeline - Jingbian to Shanghai section |
1482 km / 921 miles |
750 000 mt |
| Started or completed pipeline project |
West-East Pipeline - Tarim to Jingbian section |
2525 km / 1569 miles |
1 276 000 mt |
| Started or completed pipeline project |
West-East Pipeline |
4200 km / 2610 miles |
2 124 000 mt |
| Started or completed pipeline project |
Western Libya Gas Project (WLGP) |
540 km / 336 miles |
185 000 mt |
| Started or completed pipeline project |
West-to-East Nat. Gas Pipeline Proj. Phase 1 |
1856 km / 1154 miles |
940 000 mt |
| Started or completed pipeline project |
White Oil Pipeline |
817 km / 508 miles |
185 000 mt |
| Started or completed pipeline project |
Wuhan to Huangshi |
77 km / 48 miles |
23 000 mt |
| Started or completed pipeline project |
Yamal-Western Europe Pipeline Belarus Section |
682 km / 424 miles |
630 000 mt |
| Started or completed pipeline project |
Yolla Field to BassGas processing plant Pipeline |
146 km / 91 miles |
12 000 mt |
| Started or completed pipeline project |
Zamzama to Peshawar |
590 km / 367 miles |
125 000 mt |
| Started or completed pipeline project |
Zhongxian to Wuhan |
718 km / 446 miles |
210 000 mt |
| Started or completed pipeline project |
Zibo-Weifang Gas Pipeline |
115 km / 71 miles |
16 000 mt |